Cambridge City FC – Main Stand Refurbishment | KG Projects

Cambridge City FC, Sawston

Structural refurbishment of the main stand at the FWD-IP Community Stadium. Completed in five days, including disassembling and reassembling.

The Scope of Works

Working ahead of a weekend fixture, our team stripped out the entire stand at Cambridge City FC's stadium, removing each of the original steel support legs one at a time. New, thicker steel legs were supplied to site and installed by our team, who rebuilt the stand, fitted new cladding throughout, and left the ground fully match-ready. The steelwork itself was supplied ready to install — our scope was the on-site structural installation, not fabrication.

5

Days Start to Finish

Complete strip-down, new steelwork installation, and re-cladding, delivered in five days ahead of a weekend fixture.

Match Ready

Deadline Met

Ground fully reassembled and match-ready in time for the weekend fixture.

         Scope

 

Stand Strip & Rebuild

Every steel support leg removed one at a time and replaced with new, thicker steelwork supplied to site.

Before & After

The stand before work began, and the completed rebuild ready for the weekend fixture.

“KG Projects team were highly professional, polite and worked unbelievable hours, they were the first people at the stadium at 8am, and the last ones to leave at 8pm, every day. We have no doubt, worries or concerns knowing they are working on one of our projects.”

Pammy, MD, Titan Structures

© 2026 KG Projects. All rights reserved.